Representative Opportunities Available
Southeast US (SE US)
SE 1
Mississippi River Industrial Site & Waste Processing
Feedstock:
Bagasse (up to 500 TPD) supported with other feedstock streams as needed
Site Size:
57 acres
on the Mississippi River / Can Be Sectioned Off
Infrastructure:
Multiple barge slips
Rail spur into a 350,000 sq ft facility
with 12” reinforced slab
Development Options:
Buy, lease, or lease with purchase option, JV
Processing Capacity:
500+ TPD of bagasse and/or alternative feedstocks
Regional Advantage:
Strategic logistics hub
with multi-modal access (rail, barge, road)
For More Information Contact Us
For More Information Contact Us
SE 2
MSW & Green Waste Transfer Station
Feedstock Processing Capacity:
80–100 TPD MSW & Green Waste
Acquisition Opportunity:
Available for purchase ($15M ask)
Revenue Model:
$5M in revenue with
20% annual growth over the past 2 years
Just Awarded 3 Yr Municipal Front Load Contract
Processing Needs:
Would require a
dirty MRF
with graters and shredders
Expansion Potential:
Can deploy in stages at this site
Rail Potential:
Possible rail spur integration
SE 3
Takeover / Revitalize Struggling Waste-to-Energy Project
Permitted Waste to Energy Project
Feedstock Processing Capacity:
200 TPD MSW
Site Condition:
Partially built Dirty MRF already on site, all parts of MRF and Shredding deployed
Non-performing Gasification System:
This must be replaced or overhauled
Must Obtain Local Board Support:
Direct backing from county commissioners
Funding:
Existing project funds spent with debt assumption opportunity
Potential Opportunity to Acquire Landfill
For More Information Contact Us
For More Information Contact Us
SE 4
Mixed Plastics Processing & Metal Recovery
Feedstock:
50,000 tons of mixed plastics (Approx. 45% LDPE, 45% PP, <10% PET)
Infrastructure:
Rail spur potential, potential permanent location
Process:
Pre-treatment using float-sink separation to remove contaminants, potential PVC separation
Metal Recovery:
Copper fines recoverable—potential monetization to offset processing costs
Separation Equipment:
Previous $800K quote for a German-made water separation system for float sink to separate PE materials from PVC and Copper
SE 5
Mixed Plastics & Metal Recovery – Expansion Opportunity
Feedstock:
50,000 tons of mixed plastics (same as SE-4) and in close proximity to SE-4
Processing:
Either on-site or transport to SE-4 or SE-6 for centralized processing
Separation:
PVC separation required; copper fines potential, same as SE-4
Operational Strategy:
Can function independently or integrate with SE-4
For More Information Contact Us
For More Information Contact Us
SE 6
Aggregation Hub for Plastics & Alternative Permanent Site
Scale:
100,000 tons (combining SE-1 & SE-2 feedstocks)
Site Potential:
27-acre location under evaluation with Rail Spur and Interstate Access
Long-Term Vision:
50TPD processing = 10+ year project with scalable feedstock
Augment With Additional Feedstocks:
Access to other feedstocks
Regional Expansion:
Can serve as a consolidation site for additional SE US locations
SE 7
Permitted Landfill - Tire Processing & Waste-to-Energy
Permitted
Landfill:
State Regulatory Support to Resolve and Bring Back Online
Feedstock:
Over 2 Million whole tires
Land Use:
Potential landfill acquisition for waste-to-energy redevelopment
Processing Challenge:
Requires shredding before utilization
Regulatory Support:
State-level environmental agency prioritization due to owner issues
Owner Insolvency
: Owner not financially capable to resolve, and holding out for favorable deal structure.
For More Information Contact Us
For More Information Contact Us
SE 8
XLPE Waste Processing Site 1 & National Expansion
Feedstock Processing Capacity:
50 to 200+ TPD of
XLPE waste
Scalability:
Opportunity to
expand to multiple national locations
Industry Application:
XLPE must be
completely destroyed
, making it ideal for waste-to-energy or gasification technologies
Northeast US (NE US)
NE 1
Mixed Plastics & Metal Recovery – Expansion Opportunity
Feedstock:
50,000 tons of mixed plastics (Approx. 45% LDPE, 45% PP, <10% PET)
Process:
Pre-treatment using float-sink separation to remove contaminants, potential PVC separation
Metal Recovery:
Copper fines recoverable—potential monetization to offset processing costs
Separation Equipment:
Previous $800K quote for a German-made water separation system for float sink to separate PE materials from PVC and Copper
For More Information Contact Us
For More Information Contact Us
NE 2
Mixed Plastics Processing & Metal Recovery
Feedstock:
50,000 tons of mixed plastics (Approx. 45% LDPE, 45% PP, <10% PET)
Process:
Pre-treatment using float-sink separation to remove contaminants, potential PVC separation
Metal Recovery:
Copper fines recoverable—potential monetization to offset processing costs
Separation Equipment:
Previous $800K quote for a German-made water separation system for float sink to separate PE materials from PVC and Copper
South-Central US (SC US)
SC 1
XLPE Waste Processing Site 2 & National Expansion
Feedstock Processing Capacity:
50 to 200+ TPD of
XLPE waste
Scalability:
Opportunity to
expand to multiple national locations
Industry Application:
XLPE must be
completely destroyed
, making it ideal for waste-to-energy or gasification technologies
For More Information Contact Us